| 1) SLIP UPRIGHT JAMBS OVER
WALL. BUTT UP TO HEADER, CHECK FINISHED OPENING WIDTH AND PLUMB.
FASTEN TO WALL USING TYPE 'S' DRYWALL SCREWS, SPACED A MINIMUM OF
TWO INCHES FROM EACH END AND A MAXIMUM OF 12" ON CENTER |
|
| 2) ATTACH UPRIGHT JAMBS TO
HEADER USING ONE CORNER CLIP AND AT LEAST FOUR ½" LONG SELF-TAPPING
SCREWS AT EACH CORNER AND ON EACH SIDE OF THE WALL. ATTACH HEADER TO
WALL AS IN STEP 1. |

|
| 3) SLIDE SILL OVER WALL
BETWEEN UPRIGHTS. SQUARE AND ATTACH TO SIDE JAMBS USING CORNER CLIPS
AS IN STEP 2 . FASTEN TO WALL AS IN STEP 1. |

|
|
SKIP STEPS 4 & 5 IF FRAME HAS NO
MULLIONS |
|
| 4) VERTICAL MULLIONS -
ASSEMBLE MULLION BY SLIDING REGLET INTO UPRIGHT JAMB AND SECURING
WITH SELF-TAPPING SCREWS. ATTACH MULLION TO HEADER AT PROPER
POSITION USING 'T' CLIPS. NOTE: HEADER MUST BE NOTCHED FOR 'T' CLIP
|

|
| 5) HORIZONTAL MULLIONS -
ASSEMBLE MULLION BY SLIDING REGLET INTO MULLION SILL SECTION AND
SECURING WITH SELF-TAPPING SCREWS. ATTACH MULLION TO JAMBS AT PROPER
POSITION USING MULLION CLIPS AND SECURING WITH SELF-TAPPING SCREWS.
|

|
| 6) WITH SNAP-IN GLASS STOP
REMOVED FROM SILL, SET GLASS WITH WET GLAZING COMPOUND. INSTALL
GLASS STOP. |
| 5) CHECK FRAME FOR PLUMB AND
SQUARE. CUT TRIM TO REQUIRED LENGTH AND SNAP ON TO FRAME. INSTALL
DOOR AND HARDWARE. |
| 7) SNAP-ON TRIM TO COVER
SCREWS AND FINISH FRAME. TRIM IS MITERED AT CORNERS AND SQUARE AT
MULLIONS. |
|
Eclipse Systems, Inc., 943 Hanson
Court, Milpitas, CA 95035 Ph (408) 263-2201 - Fax (408)
263-2206
|